Concrete Walkways and Steps in London, Ontario
The path every guest walks and every step you take in winter boots. Built level, even and safe.
What to know before you replace them: how wide to make the walk, where it should run, how steps should be built so nobody trips, poured vs precast steps, why steps pull away from the house, which finish grips best, and what a good quote should spell out.
Rule one
Every riser the same height. The odd step is the one people trip on.
Concrete
32 MPa, air entrained for freeze and thaw
Walk
About 4 ft wide on compacted Granular A
Steps
Even risers and landings, built to the Ontario Building Code
Spec 01 · Width
Size the walk for what moves on it.
Many older London front walks are 2 to 3 feet of cracked slabs or patio stones. That was fine for the mail carrier. It is tight for a stroller, a bin on wheels or two people arriving together, and a narrow walk beside a snowbank gets narrower all winter. Start from these widths.
Garden or side path
One person at a time, to a shed, a gas meter or the back gate. Narrower than this and you end up walking on the lawn.
WidthAbout 3 ft
Front walk
The width most London homes should have: room for one person with groceries, a stroller or a wheeled bin.
WidthAbout 4 ft
Front walk, side by side
Two people can walk together or pass each other. Looks right in front of a wider house or a double front door.
WidthAbout 5 ft
Side yard to the backyard
Often squeezed between the house and the lot line. It has to keep the side-yard swale working, more below.
WidthAbout 3 to 4 ft
Landing at a door
Room to stand, open a storm door that swings out, and set down a parcel without stepping backwards off the edge.
WidthAt least as wide as the door, about 3 ft deep or more
Bins, bikes or a wheelchair
Wider and flatter makes everything with wheels easier. Tell us at the visit and we plan the slopes around it.
WidthAbout 4 to 5 ft, gentle slope
Spec 02 · Route
Put the walk where people already walk.
A worn line in the grass tells you where the walk should have been. Most homes need one or more of these four routes, and they work best planned together.
W-1
Door to driveway
The walk most people actually use. It runs from the front step to the driveway, so the two should meet flush, with no lip to trip on or catch a shovel.
W-2
Door to the street
The classic straight walk to the City sidewalk. The strip between your lot line and the curb is City land, so work there is checked with the City first.
W-3
Side walk to the gate
Driveway to backyard along the side of the house, past the meters and the downspouts. Keeps mud off the lawn and the bins off the grass.
W-4
Walk into a patio
A path that carries on round the back and opens into a patio or a hot tub pad, poured in the same finish so it reads as one plan.
Walk beside the driveway
Under London's zoning rules, a walkway that runs right alongside a driveway can count toward the maximum driveway width, which depends on your lot frontage. A wide walk along the driveway can push the total past the limit, so we measure the frontage and check the rule for your lot before we draw it. Planning both? See concrete driveways in London.
Side yards and swales
The strip between two houses is often a shallow swale that carries both yards' rain to the street, and it is part of your lot's approved grading. A side walk has to keep that water moving: set at the right height, sloped with the swale, never a dam across it.
Spec 03 · Steps
Six things that make steps safe in a London winter.
Steps are where a walkway job is won or lost. The Ontario Building Code sets the limits for how tall each riser and how deep each tread can be at a house, and how much they may vary; we build to the current code. Inside those limits, these are the details that decide whether your steps feel right or feel like a trap.
S-1
Even risers
Every step the same height. A single step that is off by even half an inch is the one people trip on, because your feet set their rhythm on the first two.
S-2
Deep enough treads
A tread you can put your whole foot on, coming down in winter boots. Deeper treads and lower risers make an easier, safer stair outside.
S-3
A real landing
A flat landing at the door, so you are not standing on a step while you open it. Long flights get a landing part way up.
S-4
Handrails and guards
Rails on longer flights, and guards where a landing or porch sits high above the ground. We plan where the posts land before the pour so the anchors go in solid concrete.
S-5
Water off the treads
Each tread falls slightly to the front edge, so rain runs off instead of sitting there and freezing into a sheet of ice.
S-6
A grippy finish
Broom or exposed treads, never a smooth trowelled top, with a rounded front edge that holds up to shovels and salt.
Poured or precast steps?
Precast steps are made at a plant and set in place. Poured steps are formed and poured on site. Both can last; this is how they differ.
Poured in place
- Best for
- Any size, any number of steps, a landing, a curve or a wrap-around
- Fit
- Built to your exact door height, so every riser comes out even
- Look
- Same concrete and finish as the walk, poured as one plan
- Watch for
- Needs forms, a pour day and curing time before use
Precast steps
- Best for
- A standard stoop of 2 to 4 steps at a side or back door
- Fit
- Fixed sizes from the plant; the bottom or top step may not match your door height
- Look
- Their own colour and finish, separate from the walk
- Watch for
- Set on a small base, they can settle or tilt toward the house if the base under them is poor
We pour. For a front entrance, poured steps that match the walk are the usual pick. For a simple back stoop, we tell you honestly if precast would do the job.
Spec 04 · Frost + the house wall
Why old steps tilt toward the house.
The ground right against your foundation was dug out and backfilled when the house was built, so it is often the softest soil on the lot. Much of London sits on clay that holds water and heaves when it freezes. Steps set on that with a thin base settle, rock and lean in, and then the gap at the wall funnels water straight down the foundation.
- Real support under the steps, down through the soft backfill, so they do not ride the frost.
- A joint against the wall, so the steps and the house move on their own without cracking each other.
- Compacted Granular A under every walk, never topsoil, so water drains out instead of freezing under the slab.
- Walks fall away from the house, about 1 to 2 percent, toward lawn or the driveway, never toward a window well.
- Downspouts planned so roof water is not dumped on the steps, where it freezes first.
Spec 05 · Finishes
Grip first, then looks.
A walkway and steps get more salt, slush and shovel scrapes than any other concrete on the lot. The finish has to grip when wet and stand up to that, then match the driveway and the house.
Broom finish
Fine grooves across the walk for grip in rain and slush. The standard for front walks and steps, and the easiest to keep clean.
Exposed aggregate
The stone in the mix is washed out to show. Excellent grip and it hides salt stains and wear, which is why it suits busy steps.
Stamped
Slate, flagstone or brick patterns. Lovely on a front walk; on steps we keep the pattern off the tread edge or pick a grippy texture.
Border + field
A broom walk with a stamped or coloured border. Ties the walk to a bordered driveway for a fraction of a fully decorative job.
Spec 06 · Repair or replace
Signs your walk or steps are done.
A hairline crack in a level walk is cosmetic. Movement is not: once a step rocks or a slab tips, patches and top coats fail the next winter because the base under them is still moving. If you see any of these, it is usually time to break out and rebuild from the base up.
- Steps tilting toward the house or pulling away from the wall, with a gap you could put a finger in.
- A walk sunk below the lawn or the driveway, holding water after rain.
- Trip edges where two slabs have heaved or settled apart.
- Scaling: the top surface flaking off in patches, usually from salt and freeze and thaw.
- Hollow sound or crumbling corners on the steps, exposed or rusting steel.
- Water running toward the foundation, or a damp basement wall right behind the steps.
Spec 07 · How it is built
From the old steps out to the new ones in use.
A front walk with a set of steps is usually two working days on site, plus curing. Longer walks, wrap-around landings and stamped finishes add time. We pour when it is above 5 °C and plan pour day around the forecast. While the steps cure we leave you a safe way in, or plan the job around a second door.
-
Site visit
Measure and plan
We measure the door sill heights and the ground, work out the number of steps and the walk route, check where the water goes, and agree on width and finish. One written quote follows.
-
Day 1
Break out and haul away
Old steps, slabs or patio stones come out and leave the site. Sod and topsoil are dug out to firm ground for the new walk.
-
Day 1
Base, footings and forms
Compacted Granular A in lifts under the walk. Steps get their support below them and a joint against the house wall, then forms are set to the final heights and slopes.
-
Day 2
Pour and finish
32 MPa air-entrained concrete with reinforcement. The walk gets its finish, and the steps are formed riser by riser with grippy treads and rounded edges.
-
Next day
Strip forms, cut joints
Forms come off the steps and control joints are cut in the walk, so any cracking runs in the joints, not across the middle of a panel.
-
A day or two on
Back to using it
Careful foot traffic after about a day, normal use after a few days. Keep bikes, dollies and anything heavy off for about a week.
Spec 08 · Comparing quotes
Ten things every walkway and steps quote should say.
Quotes for the same front entrance can be far apart, and the difference is usually what holds the steps up and what is under the walk. Line them up against this list. Our written quote answers every line.
Permits, briefly
Replacing a walk or a few steps on your own lot at ground level usually needs no building permit in London. Work on the City strip by the curb needs the City's OK first, and a walk beside the driveway can count toward your driveway width. Bigger porches, raised landings that need guards and any roof over the steps fall under the Ontario Building Code. We check your lot at the visit; the City has the final word.
- Width and route of the walk on a drawing, and where it meets the driveway and the door.
- Number of steps, the riser height and tread depth, and the landing size.
- How the steps are supported against frost, and the joint between steps and house.
- Base: depth of compacted Granular A under the walk.
- Concrete: strength in MPa and air entrained for freeze and thaw.
- Thickness and reinforcement for the walk and the steps.
- Finish on the walk and on the treads, and the colour and sealer for anything decorative.
- Where the control joints go, and how the walk joins the driveway.
- Removal of the old steps, walk or stones: included or extra.
- Who supplies and installs any handrail, and where the anchors go.
Spec 09 · Walkway + steps questions
Asked before every walkway quote.
How wide should a front walkway be?
About 4 feet is the sweet spot for a front walk: room for one person with bags, a stroller or a bin. About 5 feet lets two people walk side by side. Side and garden paths can be about 3 feet. Under 3 feet feels cramped and people step onto the lawn.
How thick is a concrete walkway?
A walkway is usually 4 inches of concrete on compacted Granular A. Where a walk will carry more than feet, like a strip beside the driveway that a car tire can catch, or a path a lawn tractor uses, we build that part thicker.
Do I need a permit for a concrete walkway or steps in London, Ontario?
Replacing a walkway or a few steps on your own lot at ground level usually does not need a building permit in London. Work on the City strip between your lot line and the curb needs the City's OK first, and a walk beside the driveway can count toward your driveway width. Larger porches, raised landings that need guards, and any roof over steps fall under the Ontario Building Code and may need a permit. We check what applies to your lot at the visit; the City of London has the final word.
Can I widen my driveway with a walkway beside it?
Maybe, and it is worth checking first. Under London's zoning rules a walkway that runs right beside the driveway can count toward the maximum driveway width, which is set by your lot frontage. We measure your frontage and check the rule for your lot before drawing a wide walk along the driveway; the City has the final word.
Poured or precast concrete steps: which is better?
Precast steps are quick and fine for a standard 2 to 4 step stoop at a side or back door, if they are set on a solid base. Poured steps are built to your exact door height, so every riser is even, and they can be any width, with a landing, and finished to match the walk. For a front entrance, most people want poured.
How tall can a step be?
For a house, the Ontario Building Code limits how tall each riser can be and how shallow each tread can be, and it requires the risers in a flight to be nearly identical. We build every set of steps to the current code; a lower riser and a deeper tread make an easier, safer stair outside, especially in winter boots.
Do my concrete steps need a handrail?
It depends on how many steps there are and how high the landing is. Short runs of a few steps at a house often do not need one under the Ontario Building Code; longer flights do, and raised landings and porches need guards. A rail is a good idea for anyone who uses the steps in ice or snow either way. We plan the anchor points before the pour.
Why are my concrete steps pulling away from the house?
Usually because they were set on a thin base or on disturbed soil that settled and heaved with frost. Steps sit right next to the foundation, where the soil was dug out and backfilled when the house was built, so it is often the softest ground on the lot. New steps need proper support and a joint against the wall so they move as one piece.
Can old concrete steps be repaired instead of replaced?
Sometimes. Steps that are solid and level with a little surface damage can last more years. Steps that tilt, rock, pull from the wall or crumble at the corners usually need replacing, because a patch on a moving base fails the next winter. We tell you plainly which one you have.
Can I use salt on new concrete steps and walks?
Skip salt the first winter and use sand for grip. After that, use as little plain rock salt as works and shovel off the slush. Never use de-icers or fertilizers with ammonium nitrate or ammonium sulfate; they attack concrete.
When can you pour walkways and steps in London?
We pour whenever it is above 5 °C, so most of spring, summer and fall work, and steps can often go in late in the season. Spring books up first. Call or text for open dates.
Free site visit
We measure your door heights and the ground, plan the walk and the steps with you, and leave one written quote.