Skip to content
Call 519-691-6771
519-691-6771 Get a Free Quote Free Quote

Sheet D-130 · London, Ontario

Concrete Patios in London, Ontario

A backyard slab sized for how you live, sloped away from the house and built for freeze and thaw.

What to know before you build: how big to make it, where the water goes, the step down from the door, hot tub pads, which finish to pick, how it compares with interlock and wood, and what a good quote should spell out.

Freshly poured broom-finish concrete slab with a contrasting border

Rule one

Water runs away from the house. Everything else is built around that.

Concrete

32 MPa, air entrained for freeze and thaw

Base

Compacted Granular A, never topsoil

Slope

About 1/8 to 1/4 inch per foot, away from the house

Spec 01 · Size

Size it for the furniture, then add room to move.

The most common regret is a patio that is too small. Chairs need about 3 feet behind the table to pull out, and people need a path past the table to the yard. Measure the furniture you own or plan to buy, then use these starting points. At the site visit we paint the outline on your lawn so you can stand in it before anything is dug.

Bistro table for 2

A small landing outside the back door. Enough for two chairs and a path past them.

SizeAbout 8 x 8 ft

Dining for 4

Room to pull the chairs back from the table without dropping a leg off the edge.

SizeAbout 10 x 12 ft

Dining for 6 to 8

The size most families end up wishing they had built the first time.

SizeAbout 12 x 14 ft

Dining + barbecue

Keep the grill off the walking path and away from siding and windows.

SizeAdd about 6 x 8 ft

Lounge set or fire table

A sofa, two chairs and a low table need more room than a dining set.

SizeAbout 12 x 12 ft or more

Hot tub

A thicker pad under the tub, sized to the maker's spec. More below.

SizeTub plus 2 to 3 ft on the step-in side

Spec 02 · Layout

Four layouts that work in London backyards.

Most London lots have a back door a few steps above the yard, a side yard to the driveway and a fence line close by. The layout should connect those, not just fill a rectangle.

P-1

Off the back door

The classic: a slab outside the patio door, one step down, sized to the furniture. Gets the drainage right first because it sits against the house.

P-2

Wrap-around

An L that follows the back and side of the house, joining the patio to the side walk and gate so the yard has one clean path to the driveway.

P-3

Two zones

A dining slab by the door and a second pad out in the yard for a fire table or lounge, linked by a walk. Breaks up a big area and keeps smoke away from the house.

P-4

Pool or hot-tub patio

Concrete that carries the patio out to the pool or holds the tub pad, with grip and drainage built for wet feet.

Concrete pool decks

Doing the front too? A patio, side walk and driveway poured by the same crew can share one finish and one border. See concrete driveways in London.

Spec 03 · Base, drainage + the door

A patio sits against your foundation. Build it like it.

A driveway that drains badly makes puddles. A patio that drains badly sends water into your basement. Much of London sits on clay that holds water and heaves when it freezes, so the base and the slope matter more here than almost anywhere.

The most common bad patio we see: poured on topsoil, settled toward the house, and now a funnel for rain right at the foundation wall.

  1. Dig to firm ground. Sod and topsoil come out. Organic soil rots and compresses, and the slab follows it down.
  2. Compacted Granular A. Crushed stone placed and compacted in lifts gives the slab an even, draining bed that does not hold water under it.
  3. Fall away from the house. About 1 to 2 percent, toward lawn, a swale or a drain, never toward a neighbour's yard or a window well.
  4. A step down from the door. The slab stays below the door sill and the bottom of the siding, so rain and snowmelt cannot run back inside.
  5. Even steps. If the door is high, poured steps get even risers and deep enough treads. The Ontario Building Code sets limits on step height and depth, and guards where a surface is high enough above the ground; we build to it.
  6. Mind the downspouts. We plan where they discharge so roof water is carried off the patio, not dumped on it.

Spec 04 · Hot tub pads

The heaviest thing in your yard needs its own spec.

A filled hot tub with people in it can weigh well over two tonnes, sitting on a few square feet, through every freeze and thaw. Pavers and thin slabs settle under it and the tub goes out of level, which strains the shell and the warranty.

  • Thicker under the tub, to the tub maker's pad spec, with reinforcement.
  • Dead level where the tub sits, still draining around it.
  • Conduit before the pour. Your electrician tells us where the power comes in; in Ontario the wiring is done by a licensed electrical contractor under an ESA permit.
  • Room to step in and lift the cover, plus a path that does not cross the lawn.
  • About four weeks before the tub goes on, so the concrete is near full strength.
Backyard with a stamped concrete patio and pool deck, dark coping and a stone waterfall

Spec 05 · Finishes

Same slab, four ways to finish it.

The finish changes the look, the grip and the upkeep, not the strength. Around a barbecue or a hot tub, grip wins; in a shady corner under trees, a finish that hides leaf stains wins.

Broom finish

Fine grooves across the slab. The best grip and the lowest cost, and the cleanest modern look next to new siding.

Exposed aggregate

The stone in the mix is washed out to show. Good grip barefoot or in the rain, and it hides dirt, leaves and wear better than any other finish.

Stamped

Slate, flagstone or wood-plank patterns in two colours. The most popular backyard choice when the patio is the feature of the yard.

Stamped concrete guide

Border + field

A plain broom field with a stamped or coloured border. Most of the look of a decorative patio for a lot less, and easy to match to a driveway.

Sun matters too: dark colours get hot under bare feet in July, and light ones show barbecue grease. Mid greys and earth tones are the safe middle.

Spec 06 · Concrete vs interlock vs wood

How a concrete patio stacks up.

We only pour concrete, so take this as a fair summary from one side. Each one can be done well or badly; the base decides most of it.

Poured concrete

Lifespan
Decades on a proper base
Upkeep
Low. Reseal stamped or coloured every 2 to 3 years
Weeds
None: one solid slab, no joints between pieces
Watch for
Can crack. Joints are cut so it cracks where we choose

Interlock pavers

Lifespan
Long, if the base holds
Upkeep
Re-sand joints, pull weeds, reset sunken pieces
Weeds
Joints can grow weeds and host ants
Watch for
Single pieces settle or heave over the years

Wood deck

Lifespan
Shortest of the three
Upkeep
Stain or seal every year or two, replace boards
Weeds
Space underneath collects leaves and animals
Watch for
Rot, splinters, and a permit when it is high enough off the ground

Spec 07 · How it is built

From paint on the lawn to furniture back out.

A typical backyard patio takes two working days on site, plus curing. Bigger slabs, steps and stamped finishes add time; we pour when it is above 5 °C and plan pour day around the forecast.

  1. Site visit

    Lay it out with you

    We mark the shape on the lawn with paint, check the door sill height and where the water goes now, and agree on size, finish and steps. One written quote follows.

  2. Day 1

    Dig out and haul away

    Sod, topsoil and any old patio stones or slab come out and leave the site. We dig down to firm ground, never pour on topsoil.

  3. Day 1

    Build the base

    Compacted Granular A in lifts, graded so the finished slab falls away from the house. Forms set to the final height, a step below the door sill.

  4. Day 2

    Pour and finish

    32 MPa air-entrained concrete with reinforcement held up in the slab, then the finish you picked: broom, exposed or stamped.

  5. Next day

    Cut the control joints

    Saw-cut joints split the slab into panels so any cracking runs in the joints instead of across the middle.

  6. About a week on

    Back to living on it

    Walk on it after a day or two, furniture and the barbecue after about a week. Stamped and coloured patios get sealed once cured.

Access: a concrete truck needs to get close, or the concrete is pumped or wheeled in. A side gate of about 4 feet helps; a fenced backyard with no gate may mean a pump. We sort this out at the visit so it is in the quote, not a surprise on pour day.

Spec 08 · Comparing quotes

Nine things every patio quote should say.

Two patio quotes for the same yard can be far apart, and the gap is usually underground: less base, no slope plan, a thinner slab. Line them up against this list. Our written quote answers every line.

Permits, briefly

A patio at ground level usually needs no building permit in London. It still has to drain without sending water onto a neighbour, stay off easements and keep your lot's approved grading. Raised surfaces that need a guard, and roofs or pergolas over a patio, fall under the Ontario Building Code. We check your lot at the visit; the City has the final word.

  • The size and shape on a drawing, and how many steps down from the door.
  • How the slab drains: which way it falls and where the water ends up.
  • Base: depth of compacted Granular A, and what happens if soft soil turns up.
  • Concrete: strength in MPa and air entrained for freeze and thaw.
  • Thickness and reinforcement, and a thicker section under any hot tub.
  • Finish, colour and sealer, with samples for anything decorative.
  • Where the control joints go.
  • Removal of sod, old stones or the old slab, included or extra.
  • How the lawn edge is left: topsoil and seed, or left for you.

Spec 09 · Patio questions

Asked before every patio quote.

Do I need a permit for a concrete patio in London, Ontario?

A patio poured at ground level usually does not need a building permit in London. What still matters: it cannot send water onto your neighbour or change your lot's approved drainage, it should stay off easements, and anything raised high enough to need a guard, or any roof or structure over it, falls under the Ontario Building Code. We check what applies to your lot at the site visit; the City of London has the final word.

How thick should a concrete patio be?

A standard patio is usually 4 inches of concrete on a compacted Granular A base. We go thicker where it carries more: under a hot tub, a heavy outdoor kitchen or a spot where a car or trailer might cross. The base under the slab matters as much as the thickness.

How much slope does a patio need?

Enough to move water without you noticing it: about 1 to 2 percent, roughly 1/8 to 1/4 inch per foot, falling away from the house. On a 12 foot patio that is about 1.5 to 3 inches from the house to the far edge. Flat slabs hold puddles, and puddles freeze.

Can you pour a new patio over my old one or over patio stones?

Rarely. A new slab on top raises the surface toward your door sill and siding, and it copies every crack and sunken spot in what is underneath. Old patio stones and a worn slab are almost always removed and the base rebuilt. We tell you plainly at the visit if your slab is a rare exception.

Can a concrete patio hold a hot tub?

Yes, if it is built for it. A filled hot tub with people in it can weigh well over two tonnes, so the pad under it is thicker and sized to the tub maker's spec, and it must be level. Ask your electrician about the power before we pour so a conduit can go in under the slab; in Ontario hot tub wiring is done by a licensed electrical contractor under an ESA permit.

When can I put furniture and a barbecue on a new patio?

Foot traffic after a day or two and furniture and the barbecue after about a week. A hot tub waits longer, usually about four weeks, so the concrete is near full strength. Cool fall weather slows curing, so we give you the dates for your pour.

Will a concrete patio crack?

All concrete can crack; the goal is to control where. A compacted base, reinforcement and saw-cut control joints keep cracking in the joints. Most patio problems we see come from slabs poured on topsoil with no base, which settle toward the house.

Concrete or interlock: which is better for a patio?

Concrete is one solid slab: no joints for weeds or ants, no single pieces sinking. Interlock pieces can be lifted and reset. We pour concrete only, so we will tell you honestly whether a broom, exposed or stamped slab fits your yard and budget.

Can I use salt on a concrete patio?

Skip salt the first winter and use sand for grip. After that, use as little plain rock salt as works and shovel off the slush. Never use de-icers or fertilizers with ammonium nitrate or ammonium sulfate; they attack concrete.

When is the best time to build a patio in London?

We pour whenever it is above 5 °C, so most of spring, summer and fall work. Spring and early summer book up first, so if you want the patio ready for June, get the site visit and quote done early. Call or text for open dates.

Free site visit

We mark the patio on your lawn, check the drainage and the door, and leave you one written quote.

Get a Free Quote

More from the same crew: concrete driveways in London, walkways and steps, stamped concrete and pool decks. Outside London? We also pour in St. Thomas.